Tower 42
Overview
We have been delivering works at Tower 42 for over three years, supporting ICW and the building’s management team in a major programme to upgrade the M&E infrastructure and transition the building to a fully electric system, a key milestone in its journey toward net-zero operational carbon.
All works have been completed within a live, operational environment, predominantly outside normal working hours to minimise disruption. TAD has undertaken complex demolition, enabling and BWIC works, fire-stopping, and the construction of new switch rooms across multiple levels, including Levels 44, 42, 31, 22, 13 and the sub-basement.
This programme has required careful coordination, technical expertise and phased delivery within a highly serviced, occupied high-rise asset.
- Central London
- 3 Years
Project breakdown
- Strip-out and demolition
- Structural design
- Core drilling
- Steel design and installation
- BWIC and enabling works
- Blockwork walls
- Decoration
- Fire-stopping
- Ceiling installation
- Steel door supply and installation
- Structural fire sealing between floors
- Cavity barriers
- Acoustic barriers and seals