Global technology company

Construction

Overview

We delivered specialist fit-out works for a Global Tech Giant in Hemel Hempstead, a high-security, multi-megawatt facility where precision, safety, and operational continuity are critical. The project is taking place within a fully operational, live data centre, requiring exceptional coordination to protect sensitive systems while completing technically complex works.

Our team is installing high-spec switch rooms and carrying out the construction and finishing of a prominent white wall, alongside ceiling and flooring installations designed to meet the rigorous operational, acoustic, and environmental standards of a world-class facility. Fire-stopping is meticulously applied throughout, safeguarding infrastructure and ensuring compliance with stringent safety requirements.

Working in a live data centre with high levels of dust and constant operational activity demands careful planning and flawless execution. Managing this with precision, implementing strict environmental controls, carefully sequencing works, and coordinating across multiple disciplines to maintain uninterrupted operations.

This ongoing project demonstrates our capability to deliver technically demanding, high-value infrastructure works in live environments. By combining meticulous attention to detail with robust project management, we are helping ensure Amazon’s critical digital operations remain secure, reliable, and future-ready.

Project breakdown
  • Strip-out and demolition
  • Steel design and installation
  • Acoustic wall systems
  • Decoration
  • Fire-stopping
  • Raised access flooring, steps, ramps and handrails
  • Ceiling installation 
  • Door supply and installation
  • Structural fire stopping between floors
  • Cavity barriers
  • Acoustic barriers and seals
  • Air sealing, and structural steel fire protection

Related Projects

Equinix Data Centre’s
North London
Barclays
Central London
Ark Enfield Data Centre
North London